One block of South Main Street in Marysville’s Uptown area has been closed for the past two days as construction crews use a large crane to install new trusses as part of the Avalon Theatre construction. Above, the crane lowers a beam down to the roof. Below, a construction worker helps keep a large beam stable as it is lifted off the street by the crane. The road should be open on Wednesday.
(Journal-Tribune photos by Sam Dillon)