After months of standstill, work at the Pizza Hut on West Fifth Street is slated to begin again soon. The company experienced problems with the original contractor, who began work before getting certain required permits. Above, is a photo of the incomplete work on the exterior of the building. The bottom photo, taken through a window, shows the gutted interior of the building as of Friday.
(Journal-Tribune photos by Will Channell)
––––
‘Complete mess’ with contractor stops renovation at Pizza Hut
After a contentious few months of renovations, work at the Fifth Street Pizza Hut is slated to start over very soon.